One buyer for the whole facility: GPU and CPU servers, networking, storage, PDUs, UPS systems, CRACs, generators, and switchgear. Decommission once, get paid for all of it.

| 1. Send detailsmodel, qty, label photos | 2 minutes |
| 2. Confirmed offerlive market pricing | same day |
| 3. Insured logisticswe arrange & pay | nationwide |
| 4. 💵 Paymenton verification | wire/ACH |
GPU and equipment prices move daily; page ranges are indicative until confirmed.
Data center decommissioning leaks value when it's sold piecemeal: the GPU broker takes the accelerators, the ITAD takes the servers for pennies, and the electrical contractor hauls the switchgear for free. We buy the entire facility footprint — compute, network, storage, power, and cooling — so every asset class gets priced, not just the shiny ones.
On the IT side: GPU nodes (H100/A100/H200), CPU fleets, InfiniBand and Ethernet fabrics, NVMe and disk arrays. On the facility side: PDUs, UPS strings and batteries, generators, transfer switches, CRAC/CRAH units, and MV switchgear — equipment with strong secondary demand our industrial-surplus side has moved for years.
The process is one contract, staged pickups, per-asset settlement, and NIST-compliant data destruction with certificates. Whether it's a single cage or a 20MW shell, you get one number for everything and a site left broom-clean.
How fast do I get an offer on sell data center equipment?
Same business day in most cases — send model, quantity, and label photos and we confirm a live-market number, then pay on verification after insured shipping.
Do you handle data security?
Yes. NIST 800-88 media handling with certificates of destruction for any data-bearing components, plus NDAs and per-serial chain-of-custody documentation on request.
Do you buy untested or as-is hardware?
Yes — untested and as-is lots simply price differently. Condition affects the number, not whether we buy.